Hello, welcome to Jiangyin Himei Metal New Material Co., Ltd. website!

Prefabricated interior system used in hospitals

The key point of the prefabricated interior of the hospital is to separate the main structure from the interior components, and take the design as the core to coordinate the construction of the project. Through the overall design of the hospital space, the different interfaces of the prefabricated interior are built into a complete set of industrialized interior system. The whole system can be divided into seven parts: interface decoration system, partition wall system, ceiling system, ground system, storage system, toilet system, and equipment pipeline system according to the decoration interface.

1. Design points of hospital prefabricated interiors

According to the needs of medical functions, the refined interior design is carried out from the two aspects of functional parts design and interface design, and the technical scheme of prefabricated interior is formulated.

The function of interior functional parts design is mainly to integrate the customized parts system in the overall design stage of the interior space according to the functional requirements and current conditions of the medical care unit. The degree of integration of the subject.

According to the characteristics of the medical care unit, the interface space is designed as a whole. On the one hand, it can control the atmosphere and style of the indoor environment as a whole, and on the other hand, it can handle the interface between the interface and the parts and pipelines more comprehensively.

2. Technical points of hospital prefabricated interiors

The interface space is the space that is directly combined with the building components. Through the overall design of the interface space, the integrated interface space can be integrated to provide a base for the installation and integration of subsequent parts and pipeline equipment. The interface space is divided into three parts: wall space, top space and ground space.